BlueStake Solutions, LLC · Ridgeville, SC

The estimator that knows what the blue flags mean.

BLUE is underground utility estimating software built by pipelayers, not programmers. Bid faster, win more, and protect your margin on every job.

Beta is live. Design partner program open.

  • Bid Form Import → Takeoff → Bid Summary, end-to-end
  • Materials, production rates, crews — all linked, all live
  • Trench profiler, SOV, AIA-style pay requests
BLUE workbook cover sheet
BLUE · BlueStake Linework Utility Estimator

“Most estimating software was written by people who’ve never laid a stick of pipe. BLUE was built the other way around.”

— BlueStake Solutions · Built by pipelayers, not programmers

How a bid actually starts

Enter once. It flows everywhere.

A real bid begins the moment the ITB packet hits your inbox. BLUE picks it up there — and carries it all the way through to the final pay request.

  1. 01

    Bid Form Import

    Drop in the bid item numbers and descriptions from the spec book. BLUE seeds the rest of the workbook from this one entry point — type a bid item here and it shows up everywhere else it’s needed.

    BLUE Bid Form Import sheet showing the spec book entry table with yellow input cells for bid item numbers, descriptions, units, and quantities from a Shady Oaks Subdivision sample bid
    Bid Form Import — spec book entry, yellow cells are where you type
  2. 02

    Takeoff

    Build the estimate — quantities, production rates, materials, adders. Material # auto-fills description, unit, and unit cost from your Materials Database. Production rates pull from your historical numbers, not somebody else’s.

    BLUE Takeoff Sheet showing line-item buildup with quantities, production rates, materials, and per-item GPM calculations
    Takeoff — line-by-line buildup from the imported bid items
  3. 03

    Bid Summary

    Final rolled-up bid with global and per-item GPM, gross profit dollars, extended amounts, and unit price. The number you submit to the GC — with the math behind it intact.

    BLUE Bid Summary sheet showing 13 line items from a Shady Oaks Subdivision sample bid with per-line GPM and gross profit columns
    Bid Summary — Shady Oaks Subdivision sample bid with line-by-line GPM

Everything an estimator actually needs

Twenty-nine linked sheets. Unlimited buildup potential.

BLUE replaces the spaghetti pile of spreadsheets, vendor PDFs, and sticky notes most underground contractors run on today. Every sheet is wired to every other sheet so a change in one place updates everywhere it matters.

Materials Database

All material items with unit costs by work type. Type a Material # anywhere in the workbook and the description, unit, and unit cost with tax populate themselves. The Materials Entry Helper makes adding a new pipe size, fitting, or restraint a 30-second job.

BLUE Materials Database with hundreds of pipe, fitting, and restraint items organized by work type with unit costs and tax-inclusive pricing

Production Rates DB

Production rates linking labor, equipment, and output. Build a rate for “8″ sewer 8-10′ depth, open cut” once and use it everywhere. Production Rates Entry Helper for fast additions.

BLUE Production Rates Database showing crew composition, equipment, and units per day for various utility installation tasks

Takeoff Sheet

The build screen. Quantities, production, adders, GPM — all wired back to the rates and materials databases.

BLUE Takeoff Sheet showing line-item buildup with quantities, production rates, materials, and per-item GPM calculations

Markup & Fees

Bond, escalation, contingency, overhead, net profit. One screen controls the levers that turn direct cost into a winning bid.

BLUE Markup and Fees sheet showing bond percentage, escalation, contingency, overhead, and net profit margin controls

Trench Profiler

Distributes pipe footage by cut-class band from your hand takeoff. Rolls up to the Takeoff Sheet by pipe size, material, and cut class so production rates apply by depth.

BLUE Trench Profiler with manual pipe depth entry by station

Adders

Add unlimited extra materials per bid item — restraints, fittings, specialty couplings. They flow through to Bid Summary automatically, fractional quantities and all.

BLUE Takeoff Adders sheet allowing unlimited extra materials to be appended to any bid item with auto-populated descriptions and unit costs

Buildup sheets

Unlimited task-level detail per bid item. Crew days, materials, and production rates roll straight into the Takeoff — no re-keying, no broken links. Bid a pump station or a lump-sum tie-in the same way you bid a stick of pipe.

BLUE Buildup sheet for a Pump Station Complete bid item showing crew days, materials, production rates, and rolled-up total direct unit cost

After award

The job doesn’t end when you win it.

BLUE follows the project past the bid table — into scheduling, billing, change orders, and field production. One workbook, one project, cradle to close-out.

BLUE Schedule of Values showing line-item billing breakdown for monthly pay applications

Schedule of Values

Line-item SOV that drives pay request generation directly from the bid.

BLUE Pay Request sheet formatted in AIA G702/G703 style application for payment with installed-this-period values

Pay Request

AIA G702/G703-style application for payment, populated from the SOV.

BLUE Gantt Chart showing auto-generated project schedule with task bars and dependencies

Gantt Chart

Auto-generated project schedule with manual override.

Pricing

Three tiers. One workbook.

BLUE is in private beta with a small group of design partners. Subscriptions open to the public at general release — early adopters who request a demo now will be first in line.

Bronze

$49/user/mo

Solo estimator

  • Full bid pricing workflow (15 sheets: Cover through Bid Submission)
  • Materials & Production Rates databases
  • Labor, Crew, Equipment builders
  • Bid Form Import, Takeoff, Markup & Fees, Bid Summary
  • Email support

Available at launch · Reserve your seat

Gold

$299/mo

2 users included · Full operation

  • Everything in Silver
  • Gantt Chart + Change Order Log
  • Field Production Tracker + Stored Materials
  • Schedule of Values + Pay Request (billing workflow)
  • Priority support

Available at launch · Reserve your seat

How BLUE compares to the incumbents:

  • B2W: $8,000–$25,000 per user per year
  • HCSS HeavyBid: $10,000–$30,000 per user per year
  • Estimating Link: $166–$375 per user per month

BLUE is deliberately priced 4–10x below the incumbents. That is the market gap BLUE exists to fill.

About BlueStake Solutions

Built in the field. Refined in the office.

BlueStake Solutions, LLC was founded in 2026 to bring underground utility contractors an estimating platform actually built by people who came up through the trade. Our chief estimator has 40 years across wholesale waterworks and field construction — BLUE is the workbook he wished he’d had on every project he ever bid, and it respects the way real utility bids actually come together.

We’re based in Ridgeville, South Carolina, and we’re starting with the Southeastern US contractor community. If you’ve ever lost a Friday to broken vendor links and stale production rates — BLUE is for you.

  • 40years field & estimating
  • 29linked sheets in BLUE
  • 1000sof live formulas

Request a demo · Get on the beta list

See BLUE on your own bid.

BLUE is in private beta right now — a small group of design partners is onboarding. Tell us about your operation and we’ll line up a personal walkthrough on a real bid you’re working on. Beta testers go first in line, with full access at no cost during the testing period.

  • 30-minute walkthrough on your own bid
  • Live Q&A on your stack
  • No sales pressure — ever

By submitting, you agree to be contacted by BlueStake Solutions about BLUE. We’ll never sell your information. See our Privacy Policy.

Privacy Policy

How BlueStake Solutions handles your information.

Last updated: August 2, 2026

BlueStake Solutions, LLC (“BlueStake,” “we,” “us”) operates this website and provides BLUE, an underground utility estimating workbook. This policy explains what information we collect from visitors and prospects, how we use it, and the choices you have.

Information we collect

When you request a demo, we receive the name, company, email, phone number, and message you provide in the form. We do not collect cookies, run third-party analytics scripts, or track you across other sites. Basic server logs (IP address, request time, user-agent) are retained by our hosting provider for standard security purposes and are not used to build a profile of you.

How we use it

We use the information you submit only to respond to your inquiry, schedule a demo, and follow up about BLUE. We do not sell, rent, or share your information with third parties for marketing purposes.

How we protect it

Form submissions are transmitted over HTTPS. Prospect information is stored in the BlueStake Solutions Microsoft 365 tenant with multi-factor authentication required on every account with access. Only BlueStake staff who need the information to reply to you can see it.

How long we keep it

We keep demo request records while our conversation is active and for a reasonable follow-up window afterward. If you ask us to delete your information, we will do so unless we’re required by law to retain a record.

Your choices

You can ask us to correct or delete the information you’ve shared, or opt out of further contact, by emailing info@bluestakesolutions.com. Please put “Privacy Request” in the subject line so we can route it correctly.

Children

This site is a business-to-business site for utility contractors. It is not directed to children under 13, and we do not knowingly collect information from them.

Changes to this policy

If we update this policy, we’ll change the “Last updated” date at the top and, when the change is material, note it here. Please check back periodically.

Contact

BlueStake Solutions, LLC
Ridgeville, South Carolina
info@bluestakesolutions.com